◇Cost Control
Leading manufacturing process with daily capacity of 20 tons. stock of 500 tons at warehouses. Nickel and zirconium accept customization.
◇Product Quality
All products with 100% radiographic inspection qualified; roundness of the pipe mouth is much better than bending or rolling; Customizable 6-18 meter single straight welded pipeline to reduce on-site welding workload.
◇Certification
Certification with ISO 9001, ISO 45001, ISO 14001, TSG D7002-2003.
◇Processing Capability
5 automatic pipe production lines produce welded pipes with DN50-450 & 2-14mm; Bending pipe machine produce welded pipes DN500~1500 & 13-60mm;
◇Environmental Control
Delivery: Surface pickling or ultrasonic cleaning, the surface of pipes and fittings is silver white; Avoid covering surface defects during the sandblasting process.
◇Stable Supply
The degree of automation in production is high, and customized services can be provided for urgent orders such as technical upgrades and supplements;
◇Experimental Equipment
comprehensive facilities of physical and chemical experiments and non-destructive testing including: PMI, tensile testing, metallography, hardness, intergranular corrosion, manual chemical analysis, ferrite testing, RT, UT, PT, MT.
◇Clean Workshop
strict isolation and protection: the only factory in China that only produces titanium, nickel, and zirconium non-ferrous metal fittings for automatic online production of titanium pipes. The factory has a high level of cleanliness and minimizes the risk of iron ion pollution.
◇Rqw Material
The raw materials come from mainstream, legitimate, and well-known enterprises; Or designated supplier by the owner.
◇Product Self-produced 100%
Self-produced pipelines made by langzhi without subcontracting; prefabrication to ensure the quality and efficiency of on-site installation.
◇Packaging & Shipping
Safe packaging and transportation; professional training service to be provided after shipment, to ensure the safety storage.
◇Installation Services
Rich experience in factory prefabrication and on-site installation, providing turnkey projects with clear responsibility boundaries; The one-time welding qualification rate is 98%, the prefabrication progress is 60 inches/day per person, and the installation is 45 inches/day.
◇Key Management
The management team has been engaged in the production and management of 15 years, with over 8 years of experience in on-site installation business & high level of construction cooperation. Adapt to an all English work environment and provide English handover materials.